The working weight of the whole machine is about 17.28 tons.
Bucket capacity: The standard bucket capacity is 0.61 cubic meters, suitable for medium-sized excavation operations.
Transportation dimensions: 8.52 meters in length, 2.59 meters in width, and 2.93 meters in height (including counterweight), suitable for transportation in narrow spaces.
Here are the basic specifications of the Carter 315D:
Power system
Engine model: Caterpillar Cat C4.2 ACERT turbocharged engine, with a displacement of 4.25 liters and a rated power of 91 kilowatts (approximately 120 horsepower), meeting the requirements of efficient operation.
Fuel system: The fuel tank has a capacity of 300 liters and supports long-term continuous operation.
Hydraulic and Performance Parameters
Hydraulic system: Adopting a dual pump design, the maximum flow rate of the main pump is 150 liters/minute, and the pilot system pressure is 4.12 megapascals, ensuring sensitive action response.
Scope of work: Maximum excavation depth of 5.72 meters, maximum unloading height of 6.14 meters, suitable for various construction scenarios
The working weight of the whole machine is about 17.28 tons.
Bucket capacity: The standard bucket capacity is 0.61 cubic meters, suitable for medium-sized excavation operations.
Transportation dimensions: 8.52 meters in length, 2.59 meters in width, and 2.93 meters in height (including counterweight), suitable for transportation in narrow spaces.
Here are the basic specifications of the Carter 315D:
Power system
Engine model: Caterpillar Cat C4.2 ACERT turbocharged engine, with a displacement of 4.25 liters and a rated power of 91 kilowatts (approximately 120 horsepower), meeting the requirements of efficient operation.
Fuel system: The fuel tank has a capacity of 300 liters and supports long-term continuous operation.
Hydraulic and Performance Parameters
Hydraulic system: Adopting a dual pump design, the maximum flow rate of the main pump is 150 liters/minute, and the pilot system pressure is 4.12 megapascals, ensuring sensitive action response.
Scope of work: Maximum excavation depth of 5.72 meters, maximum unloading height of 6.14 meters, suitable for various construction scenarios